Paver Calculator

How many pavers a patio or walkway takes — plus the base gravel and bedding sand underneath them — then a priced patio materials breakout that folds polymeric joint-sand bags and edge restraint into one editable cost object.

Last updated (Asia/Shanghai) · Unit prices below are illustrative; replace them with local quotes.

Measure the paver itself, without the joint.
The classic brick-shaped paver is 8 × 4 in.
10% covers cuts at edges; diagonal patterns may need 15%.
4 in is typical for patios and walkways; driveways usually need 6 in or more.
A 1 in screeded layer of coarse bedding sand is the standard setting bed.

Result

Paved area
Pavers per ft²
Base gravel
Bedding sand

Units & conversions used

Imperial inputs are feet for the area, inches for the paver face and layer depths; volumes are shown in cubic yards (1 yd³ = 27 ft³). Metric inputs are converted first: 1 m = 3.28084 ft, 1 cm = 0.3937 in. The paver count treats each paver's face as covering its full length × width with no joint gap — the standard estimating simplification, with the waste allowance covering joints and cuts.

Formula & source

Pavers per ft² = 144 ÷ (paver length(in) × paver width(in))
Pavers = area(ft²) × pavers per ft² × (1 + waste%)
Base or sand volume(yd³) = area(ft²) × depth(in) ÷ 12 ÷ 27

Source: the count-by-face-area method and the 4 in base / 1 in bedding sand section are the standard residential detail published in interlocking paver installation guides (e.g., ICPI residential practice). Driveways, weak soils and freeze–thaw regions call for deeper bases — this calculator estimates materials, it does not design the pavement section.

Worked example (you can verify by hand)

Input: 10 ft × 10 ft patio, 8 × 4 in pavers, 10% waste, 4 in base, 1 in sand.

  1. Area: 10 × 10 = 100 ft²
  2. Pavers per ft²: 144 ÷ (8 × 4) = 4.5
  3. Pavers before waste: 100 × 4.5 = 450; with 10%: 450 × 1.1 = 495
  4. Base gravel: 100 × 4 ÷ 12 = 33.3 ft³ ÷ 27 = 1.23 yd³
  5. Bedding sand: 100 × 1 ÷ 12 = 8.3 ft³ ÷ 27 = 0.31 yd³

Expected output: 495 pavers, 1.23 yd³ base gravel, 0.31 yd³ bedding sand.

Limitations — what this cannot do

  • The top calculator counts pavers, compacted base gravel and bedding sand only. Polymeric joint sand and edge restraint dollars live in the priced patio materials breakout below — not as a stand-alone bags-by-joint hero.
  • Geotextile fabric, paver sealer, spikes sold separately from edge restraint, and labor are still outside both tools. Confirm those line items with your installer.
  • Base and sand volumes are compacted/in-place figures. Loose delivered material can bulk differently; suppliers usually quote by the ton or yard — confirm how yours is sold before ordering.
  • Every default dollar figure on this page is an illustrative budgeting seed, not a verified national average and not a fair-price claim.

Priced patio materials breakout (editable unit prices)

What none of the polymeric-sand SERP tools ship as one cost object: paver count × $/ea, base gravel yd³ × $/yd³, bedding sand yd³ × $/yd³, polymeric joint-sand bags × $/bag, and edge restraint lf × $/lf — on the same bill, driven by the same patio geometry. Bag-only calculators are common; this module is the combined materials cost object.

Defaults are illustrative budgeting seeds for 2026 (not verified national averages). Replace every unit price with a written local quote before you order.

Project geometry (same units as the calculator above)

Joint sand inputs (supporting bag line — not a solo bags calculator)

Typical tight joint ≈ 1/8 in.
Usually ≈ paver thickness.
SEK-style 50 lb ≈ 864 in³ assumption.

Editable unit prices (illustrative)

Materials cost object

$836.50 illustrative materials subtotal

LineQtyUnit priceLine total
Pavers495 ea$1.25$618.75
Base gravel1.23 yd³$45.00$55.35
Bedding sand0.31 yd³$40.00$12.40
Polymeric joint sand (supporting)2 bags$25.00$50.00
Edge restraint (perimeter)40.0 lf$2.50$100.00

Seed uses the 10×10 ft / 8×4 in worked example. Polymeric bags use joint-volume ÷ bag yield (not a coverage-chart brand picker). Totals exclude labor, geotextile, sealer and tax.

Assumptions & formulas for this breakout

Pavers / base / bedding = same formulas as the calculator above
Joint sand in³ ≈ area_ft² × 144 × (1 − (PL×PW)/((PL+JW)×(PW+JW))) × joint_depth_in
Bags = ceil(joint_in³ × (1 + bag_waste%) ÷ bag_yield_in³)
Edge lf = 2 × (length_ft + width_ft)
Line $ = qty × editable unit price; Total = sum of five lines

Joint-volume uses the rectangular-module gap fraction so polymeric sand stays a supporting quantity inside the bill — it is not a duplicate of the bag-only SERP tools. Bag yield defaults to 864 in³ per bag (a common 50 lb estimating rule); change it when your bag’s data sheet differs.

Hand-checkable worked cost object (10×10 ft seed)

Geometry: 10×10 ft, 8×4 in pavers, 10% waste, 4 in base, 1 in bedding, 1/8 in joints × 2.375 in deep, 864 in³/bag + 10% bag waste.

  1. Pavers: 495 (from the worked example above).
  2. Base: 1.23 yd³; bedding: 0.31 yd³.
  3. Joint fraction: 1 − 32 / (8.125×4.125) ≈ 0.0452; joint in³ ≈ 100×144×0.0452×2.375 ≈ 1,545; bags = ceil(1,545×1.1/864) = 2.
  4. Perimeter edge: 2×(10+10) = 40 lf.
  5. At illustrative $1.25 / $45 / $40 / $25 / $2.50: 495×1.25 + 1.23×45 + 0.31×40 + 2×25 + 40×2.50 = $836.50 on the rounded quantities shown in the static table (live JS uses full-precision yd³ from Calcs.paver).

Exclusive deliverable: one usable cost object with five priced lines — not bags alone.

Static seed bill for crawlers and hand checks. Prices labelled illustrative — swap for local quotes.
Line itemQuantityIllustrative unit priceLine total
Concrete pavers495 each$1.25 / ea$618.75
Compacted base gravel1.23 yd³$45 / yd³$55.35
Bedding sand0.31 yd³$40 / yd³$12.40
Polymeric joint sand2 bags$25 / bag$50.00
Edge restraint40 lf$2.50 / lf$100.00
Materials subtotalillustrative only$836.50

Waste Percent Changes the Paver Line Only: 450 / 495 / 518 / 540 Pavers on the Same 10×10 ft Slab

Running the four waste settings that today's AIO and the readable paver calculators use — 0%, 10%, 15%, and 20% — through this page's published 10×10 ft / 8×4 in materials object moves the paver count from 450 to 540 and the rounded materials total from $780.25 to $892.75, while base, sand, polymeric bags, and edge stay fixed. The AIO summary says to add 10%–15% extra, up to 20% for complex patterns; pavercalculator.net's FAQ uses the same 10 / 15 / 20 bands, Black Diamond's FAQ cites 10–15%, and the Inch Calculator article uses 10% for a straight layout and 20% for a diagonal one. This section does not rebuild the priced breakout already on the page — it only maps those bands onto the numbers this page already publishes.

In Calcs.paver, the waste input is applied to the paver count alone. The 10×10 ft area is 100 ft², the 8×4 in face gives exactly 4.5 pavers per ft², and 100 × 4.5 = 450 before waste. Base at 4 in and sand at 1 in are computed from area and depth, so they do not read the waste field at all: base stays 1.23 yd³ and sand stays 0.31 yd³ on every row. The joint volume, the 2 polymeric bags, and the 40.0 lf of edge are likewise independent of paver waste.

10×10 ft slab, 8×4 in pavers, 4 in base, 1 in sand — waste bands through this page's published materials object
WastePavers to buyPaver cost at $1.25BaseSandPolymeric bagsEdgeRounded materials total
0%450$562.501.23 yd³0.31 yd³240.0 lf$780.25
10% (this page's default)495$618.751.23 yd³0.31 yd³240.0 lf$836.50
15%518$647.501.23 yd³0.31 yd³240.0 lf$865.25
20%540$675.001.23 yd³0.31 yd³240.0 lf$892.75

The non-paver lines are the same on every row: base 1.23 yd³ × $45 = $55.35, sand 0.31 yd³ × $40 = $12.40, polymeric 2 bags × $25 = $50, and edge 40.0 lf × $2.50 = $100, for $217.75 of fixed materials. Only the paver line moves. The 15% row is $28.75 over the 10% row, and the 20% row is $56.25 over it. Those totals use the rounded 1.23 yd³ and 0.31 yd³ displays so the 10% row lands exactly on the $836.50 already published on this page; the live calculator carries full-precision cubic yards and will read a few cents higher ($780.41 / $836.66 / $865.41 / $892.91).

The common misread is to take "up to 20%" as 20% of the whole bill. It is not. Going from this page's 10% default to the AIO's top band adds 45 pavers and $56.25, not 20% of $836.50 (which would be $167.30). The waste field is a paver-count multiplier, and this function does not apply a compaction allowance to the base or sand volumes. SubcontractorHub can vary waste and can add a 15% base compaction allowance, but it does not publish this 10×10 ft / 8×4 in four-row bill with a fixed base, sand, bag, and edge set anchored to a $836.50 seed. Treat every figure here as an illustrative materials estimate, not a contractor bid.

Why This Page Says 495 Pavers Where Black Diamond's Default Says 500

The 5-paver gap between Black Diamond's 500 and this page's 495 for the same 100 ft² comes from rounding the paver face area down to 0.22 ft², not from a different patio. Black Diamond's readable default for 100 sq ft is 500 pavers, shown as "455 + 45 waste," and the same page also prints "0.22 sq ft per paver" and "4.5 per sq ft." Those two coverage figures do not agree with each other, and the 500 follows from the first one.

Two coverage figures for the same 8×4 in paver, and the paver count each produces at 100 ft² with 10% waste
Coverage usedPavers per ft²Pavers for 100 ft²With 10% wastePaver cost at $1.25
0.22 ft² per paver (rounded)1 ÷ 0.22 = 4.545…454.545… (shown 455)500$625.00
Exact 8×4 in face (this page)4.5 exactly450495$618.75

The exact face is 8 × 4 = 32 in², and 32 ÷ 144 = 0.2222… ft², which is 4.5 pavers per ft² exactly. So 100 × 4.5 = 450, and 450 × 1.10 = 495. The 0.22 figure is 0.2222… rounded down, and 100 ÷ 0.22 = 454.545…, displayed as 455, which then becomes 500 after the 10% add. The difference is 5 pavers, or $6.25 at $1.25 each. That $6.25 is exactly why this page's seed stays at $836.50 rather than $842.75. This is a rounding difference in the coverage constant, not a claim that the vendor's calculator is wrong for its own purposes.

The Metric Defaults Are a Different Project, Not a Unit Conversion of the 10×10 ft Seed

The Imperial 10×10 ft seed and the Metric 3×3 m defaults describe different slabs: 100 ft² versus 96.88 ft², with a different paver face and different base and sand depths, so the metric result of 479 pavers, 1.18 yd³ base, and 0.29 yd³ sand is not the imperial 495 / 1.23 / 0.31 converted. Switching the toggle loads a separate default set; it does not translate the worked example.

Imperial seed versus Metric defaults — area, paver face, depths, and Calcs.paver output at 10% waste
InputImperial seedMetric defaults
Slab10 × 10 ft = 100 ft²3 × 3 m = 9 m² = 96.88 ft² (exact 96.87519375038751)
Paver face8 × 4 in20.3 × 10.2 cm = 7.99 × 4.02 in
Base depth4 in10 cm = 3.94 in
Sand depth1 in2.5 cm = 0.98 in
Pavers to buy at 10% waste495479
Base volume1.23 yd³1.18 yd³
Sand volume0.31 yd³0.29 yd³

The area difference alone is 3.12 ft² (100 − 96.88). On top of that, the metric paver is 7.99 × 4.02 in rather than 8 × 4 in, and the metric base and sand are 3.94 in and 0.98 in rather than 4 in and 1 in. Each of those inputs feeds Calcs.paver separately, which is why the metric run returns 479 pavers, 1.18 yd³ of base, and 0.29 yd³ of sand. The priced breakout on this page is built on imperial feet and inches, so no metric materials dollar total is shown here — the unit prices and the $836.50 subtotal belong to the imperial object only.

FAQ

How much do concrete pavers cost?

Standard concrete pavers commonly run in the $0.50–$2.00 range each at US home centers (2025–2026) — the 8 × 4 in brick-style paver sits near the low end — with large-format and natural stone pavers costing more. Use the priced patio materials breakout to multiply paver count, base yd³, bedding yd³, polymeric bags and edge restraint by your unit prices; the defaults there are illustrative seeds only.

How deep should the base be under pavers?

4 in of compacted gravel base with 1 in of bedding sand is the standard patio and walkway section. Driveways and vehicle areas typically need 6 in or more, and soft or clay soils may need more still plus geotextile. The depths are inputs above, so adjust them to your project's spec.

Is the sand under pavers the same as the sand between them?

No. Underneath is a 1 in layer of coarse bedding sand that the pavers sit in. Between them, after laying, joints are swept with fine jointing sand — often polymeric sand, which hardens when misted. Bedding volume is in the top calculator; polymeric bags appear only as one supporting line inside the materials cost breakout, not as a stand-alone bag tool.

How do I estimate a full patio materials bill, not just polymeric sand bags?

Use the priced patio materials breakout: it multiplies paver count, base gravel, bedding sand, polymeric bags and edge restraint by editable unit prices so you get one cost object. Bag-only calculators on other sites skip the paver, base, bedding and edge lines.

Why 10% waste — can I order exactly the count?

Edges and borders require cut pavers, and some units chip in transit. On a simple rectangular running-bond patio 5–10% is typical; herringbone and other diagonal patterns cut far more pieces and usually need about 15%. Leftover pavers double as future repair stock for a cracked or stained unit.