Concrete Patio Cost Calculator

Compare bags and ready-mix with your local prices.

Quick answer: 12×12 ft at 4 in + 10% waste = 1.96 yd³: 88 bags of 80 lb mix or a 2 yd³ truck order (quarter-yard steps, no minimum). Add your prices for cost.

Calculate patio cost

Prices are optional. Blank price skips that route; blank fees or waste = 0.

Your patio result

Fees, supplier rules, other costs & thickened edge

All fields below are optional. Ask the supplier for its order step, minimum billable quantity and short-load rule. Only entered charges are included.

Bag-route extras
Mixer rental, bag delivery or labor specific to mixing bags.
Ready-mix supplier rules
Forms, base, rebar, labor and finish, only when the same for both routes. Add applicable tax here or in route-specific extras; none is assumed.
Optional patio thickened edge

Quantity assumption only, not a structural design. Extra depth means below the main slab. Auto length uses the outer rectangle perimeter; corner overlaps are not subtracted.

How to use this patio cost calculator

  1. Measure the rectangular patio and enter the actual pour depth. The default is 4 in; use 3.5 in if that is the depth set by your 2×4 forms. Thickness is an input, not a design recommendation.
  2. Enter the shelf price for your chosen bag size and the ready-mix supplier’s price per cubic yard. Leave unknown prices blank.
  3. Open the fee options and enter the ordering step, minimum quantity, short-load threshold and flat fee, plus delivery or fuel charges. A minimum quantity and a short-load threshold are different rules.
  4. If the design has a thickened edge, enable it and enter its dimensions. Add route-specific costs to that route and shared project costs to Other costs.
  5. Select Calculate. Compare the totals and cost per ft², then use the size table to explore a different footprint with the same quotes. A cheaper material route may still need more labor or better access.

Assumptions & formula

Area = L × W (ft²)
Slab ft³ = L × W × thickness_in / 12
Extra edge ft³ = beam_length_ft × edge_width_in / 12 × extra_depth_in / 12
Needed yd³ = (slab ft³ + extra edge ft³) × (1 + waste% / 100) / 27
Bags = round UP (needed yd³ × 27 / bag yield)
Truck order = round UP to supplier step (max(needed yd³, minimum order))
Bag total = bags × bag price + bag extras + other costs
Truck total = ordered yd³ × ready-mix price + applicable short-load + truck fees + other costs
Cost per ft² = route total / (L × W)

Worked patio examples: the same quotes, different sizes

Illustrative inputs only: 4 in depth, 10% waste, 80 lb bags at $6 each, $30 bag extras; ready-mix at $200/yd³, quarter-yard steps, 1 yd³ minimum, $150 short-load fee below 4 yd³, $50 truck fees; $400 shared costs. These numbers demonstrate the method and are not collected market prices.

Computed using the same function as the calculator. Totals include the $400 shared allowance. No thickened edge.
PatioNeeded +10%BagsBag total / ft²Truck orderShort-loadTruck total / ft²Cheaper
12×12 ft1.96 yd³88$958 / $6.652 yd³$150$1,000 / $6.94Bags by $42
12×16 ft2.61 yd³118$1,138 / $5.932.75 yd³$150$1,150 / $5.99Bags by $12
16×20 ft4.35 yd³196$1,606 / $5.024.5 yd³$0$1,350 / $4.22Truck by $256

12×12 arithmetic: 12 × 12 × 4 ÷ 12 = 48 ft³; 48 × 1.10 = 52.8 ft³ = 1.95556 yd³. Bags = ceil(52.8 ÷ 0.60) = 88; total = 88 × $6 + $30 + $400 = $958. Truck total = 2 × $200 + $150 + $50 + $400 = $1,000. Divide each total by 144 ft².

Optional edge example: on that 12×12 patio, the auto outer perimeter is 48 ft. A 12 in wide edge extending 8 in below the slab adds 48 × 1 × (8 ÷ 12) = 32 ft³ under the stated corner approximation. (48 + 32) × 1.10 ÷ 27 = 3.26 yd³, or 147 bags of 80 lb mix; quarter-yard steps mean a 3.5 yd³ order with a 1 yd³ minimum. For a 12 in strip wholly inside this rectangle, the centerline is 44 ft; entering 44 avoids the corner overlap.

Patio size presets: yards, bags and your price break-even

Starting quantities use 4 in depth, 10% waste, 80 lb bags, quarter-yard steps, no minimum and no thickened edge. Calculate to apply your current inputs and quotes.

Calculated quantities, not an average price chart. Select a size to use it in the tool.
Patio sizeArea ft²Needed yd³BagsOrder yd³Your quote comparison / grid break-even
1001.36621.5Enter both prices
1441.96882Enter both prices
1922.611182.75Enter both prices
3204.351964.5Enter both prices

The table reuses your bag size, waste, step, minimum, fees and shared costs. If the edge is enabled, auto perimeter changes with each size; a manual beam length is reused unchanged for every row. The winner is calculated for each actual row. A row below the grid break-even can still favor the truck because fee and rounding switches are not monotonic.

Convert your $/yd³ quote into $/ft²

For a uniform slab, one cubic yard covers 324 ÷ thickness in inches square feet before waste. Material-only cost per ft² = your price per yd³ × thickness ÷ 324. Multiply by (1 + waste% ÷ 100) for waste. Reverse it: material $/yd³ = material $/ft² × 324 ÷ thickness, before waste.

Geometry and your quote only. Excludes thickened edges, supplier rounding, minimum orders, fees and other costs.
Thicknessft² per yd³, no wasteMaterial $/ft², no wasteMaterial $/ft², your waste
3.5 in92.57Enter a ready-mix quoteEnter a ready-mix quote
4 in81.00Enter a ready-mix quoteEnter a ready-mix quote
5 in64.80Enter a ready-mix quoteEnter a ready-mix quote
6 in54.00Enter a ready-mix quoteEnter a ready-mix quote

For the worked quote of $200/yd³ at 4 in, the conversion is 200 × 4 ÷ 324 = $2.469/ft² before waste, or $2.716/ft² with 10% waste. Use the calculator’s total per ft² to include billed truck quantity, fees and your other costs. An installed quote already includes some of those items; compare matching scopes and avoid counting them twice.

When to use bags versus a ready-mix truck

Use your two totals to compare cash cost. Bags let you buy whole units for a small pour, but the handling grows quickly: 88 bags of 80 lb mix weigh 7,040 lb dry for the 12×12 example. Include mixer rental and the extra mixing labor if you will pay for them.

A truck may become cheaper as a pour grows, especially once its ordered quantity reaches the short-load threshold. Confirm truck access, unloading arrangements and whether a pump or wheelbarrow crew changes the quote. A lower materials total alone does not establish which route your crew can place and finish successfully.

A rough unrounded comparison is fixed truck fees minus bag extras, divided by (bags per yard × bag price − ready-mix price per yard). It only helps when the denominator is positive and ignores ordering steps and changing short-load fees. The calculator instead compares rounded orders over its stated sample grid.

When not to use this calculator

This is a quantity and entered-cost comparison for a rectangular poured patio. It does not size footings, design a slab, specify drainage, reinforcement, strength or freeze-thaw protection, or establish whether a hot tub, roof, vehicle or building can be supported. Confirm those requirements separately before ordering.

For curved or irregular footprints, split the slab into measured rectangles without overlaps and obtain a separate edge takeoff. For pavers, stamped overlays, resurfacing and cement-only mixes, use the actual product coverage and installation quote. Tiered short-load charges, multiple truckloads and time-based fees require the supplier’s written calculation.

Written Installed Quote versus This Page's Material Route: The Residual

A written installed quote minus this page's cheaper material route leaves a residual that covers labor, base, finish, profit, and anything else the quote includes that the material model does not — and that residual is a remainder, not a labor rate. The method is simple: residual = inst_total − min(bagTotal, truckTotal), and residual_per_ft² = residual / area. The installed totals below use Concrete Network's 2026 typical figure of about $11 per square foot, cited as their number from today's search results, not as our price; the material side uses the illustrative seed inputs already on this page (10% waste, 80 lb bags at $6, $30 bag extras, ready-mix $200/yd³, quarter-yard steps, 1 yd³ minimum, $150 short-load below 4 yd³, $50 truck fees, $400 shared, no thickened edge).

For a 12×12 slab (area 144), the cheaper material route is bags at $958. At an installed $11/ft², the installed total is $1,584 and the residual is $626, or $4.35/ft². At $8/ft², the installed total is $1,152 and the residual is $194, or $1.35/ft². At $5/ft², the installed total is $720 and the residual is −$238, or −$1.65/ft² — a written installed total below this seed material-plus-shared model, which flags a scope mismatch or different unit prices rather than making $5 our estimate. At $18/ft², the installed total is $2,592 and the residual is $1,634, or $11.35/ft².

12×12 slab (area 144): installed quote at published $/ft² vs. seed bag route of $958
Installed $/ft²Installed totalResidualResidual $/ft²
$5$720−$238−$1.65
$8$1,152$194$1.35
$11$1,584$626$4.35
$18$2,592$1,634$11.35

For a 20×20 slab, the cheaper material route is the truck at $1,550. Slabcalc's published 20×20 band of $2,400–$4,800 (their $6–$12/ft², cited as theirs) would leave a residual of $850–$3,250 against this seed. Treat every residual here as a remainder to be explained by scope, not as a quoted labor rate.

12×20 and 20×20 Takeoffs With the Same Seed Quotes

Two sizes that appear in today's search results — 12×20 from a Facebook thread and 20×20 from a Quora question — are not in the current preset table, so here they are computed with the same seed quotes. Both use 4 in thickness and the illustrative inputs already on this page.

12×20 and 20×20 at 4 in: seed bag vs. truck route
SizeArea (ft²)Needed (yd³)BagsBag totalBag $/ft²Truck orderTruck totalTruck $/ft²Winner
12×202403.2593147$1,312$5.473.5 yd³ (with $150 short-load)$1,300$5.42Truck by $12
20×204005.4321245$1,900$4.755.5 yd³ (no short-load)$1,550$3.88Truck by $350

For 12×20, the needed volume is 3.2593 yd³ (88.0 ft³ with waste), which takes 147 bags for a bag total of $1,312 ($5.47/ft²); the truck order is 3.5 yd³ with a $150 short-load for a truck total of $1,300 ($5.42/ft²), so the truck wins by $12. For 20×20, the needed volume is 5.4321 yd³, which takes 245 bags for a bag total of $1,900 ($4.75/ft²); the truck order is 5.5 yd³ with no short-load for a truck total of $1,550 ($3.88/ft²), so the truck wins by $350.

Published installed bands are cited only as their figures: Concrete Network's typical of about $11/ft² and Slabcalc's 20×20 band of $2,400–$4,800. Neither is pasted into this model.

Thickness Sweep at 12×12 and 20×20: What One Inch Costs

Holding the seed quotes fixed at 12×12 and 20×20 and sweeping thickness across 3.5, 4, and 5 inches turns a one-inch change into a computed dollar delta rather than a new national average. The 4 in rows match the page's existing 12×12 figures of $958 in bags and $1,000 by truck.

12×12 thickness sweep: seed bag vs. truck route
ThicknessNeeded (yd³)BagsBag totalBag $/ft²Truck orderTruck totalTruck $/ft²Winner
3.5 in1.711177$892$6.191.75 yd³$950$6.60Bags by $58
4 in1.955688$958$6.652 yd³$1,000$6.94Bags by $42
5 in2.4444110$1,090$7.572.5 yd³$1,100$7.64Bags by $10
20×20 thickness sweep: seed bag vs. truck route
ThicknessBagsBag totalBag $/ft²Truck orderTruck totalTruck $/ft²Winner
3.5 in214$1,714$4.295 yd³$1,450$3.63Truck by $264
4 in245$1,900$4.755.5 yd³$1,550$3.88Truck by $350
5 in306$2,266$5.677 yd³$1,850$4.63Truck by $416

At 12×12, the bag route runs $892 at 3.5 in, $958 at 4 in, and $1,090 at 5 in, so the 3.5→4 in step is +$66 and the 4→5 in step is +$132. At 20×20, the truck route runs $1,450 at 3.5 in, $1,550 at 4 in, and $1,850 at 5 in, so the 3.5→4 in step is +$100 and the 4→5 in step is +$300.

On the 12×12 bag route at these seed prices, going from 3.5 in to 4 in adds $66. On the same 12×12 bag route, going from 4 in to 5 in adds $132. On the 20×20 truck route, going from 3.5 in to 4 in adds $100. On the same 20×20 truck route, going from 4 in to 5 in adds $300. The 12×20 truck route is $12 cheaper than bags at these seeds. The 20×20 truck route is $350 cheaper than bags at these seeds. A 12×12 installed quote of $11 per square foot leaves a $626 residual after the $958 bag route. A 20×20 installed band of $2,400 to $4,800, cited from Slabcalc as their figures, leaves a $850 to $3,250 residual after the $1,550 truck route. These eight figures use the same PatioCost.estimate seeds already published on this page. They are method demonstrations, not collected market prices, and they do not add a national average to the calculator.

FAQ

How much does a 12×12 concrete patio cost?

At 4 in thick with 10% waste and no thickened edge, it needs 1.96 yd³, or 88 bags of 80 lb mix. Multiply 88 by your local bag price and add your extras. A quarter-yard supplier would supply 2 yd³ before any minimum order. Multiply the ordered yards by your quote and add applicable fees; no local price is assumed.

Is 4 inches the right patio thickness?

Four inches is this calculator’s starting assumption, not a design specification. Enter the actual planned depth. If a nominal 2×4 form sets the full pour depth, use 3.5 in. Confirm the slab, base, drainage, reinforcement and any loads with your project designer or contractor.

How many concrete bags make one cubic yard?

For Quikrete Concrete Mix No. 1101, the approximate yields used here are 0.60 ft³ for 80 lb, 0.45 ft³ for 60 lb and 0.30 ft³ for 40 lb. One cubic yard is 27 ft³: 45, 60 or 90 bags respectively, before waste. Other products may have different yields.

How do minimum orders and supplier steps work?

The calculator takes the larger of the needed yards and your minimum order, then rounds that amount up to the supplier’s 1/4, 1/2 or 1 yd³ step. A 2.1 yd³ minimum with quarter-yard steps becomes 2.25 yd³. Confirm whether your supplier bills a minimum quantity or a separate minimum charge.

When is the short-load fee added?

A single flat short-load fee is added only when the ordered truck quantity is strictly below your entered threshold. At the threshold, that fee is zero. Blank thresholds or fees add no charge. Per-missing-yard fees, tiered fees and multiple deliveries need a separate supplier calculation.

How is a thickened patio edge counted?

The optional extra volume is beam length in feet × edge width in inches ÷ 12 × extra depth in inches ÷ 12. Extra depth is below the main slab. Blank beam length uses 2 × (length + width), an outer-perimeter approximation that does not subtract corner overlaps. Enter a measured beam centerline length for a closer estimate. Blank edge width or extra depth adds zero volume.

Does the cost include labor, forms, base and reinforcement?

Only costs you enter are included. Put shared forms, base, rebar, labor or finishing costs in Other costs; these are added to both routes. Put mixer rental or bag delivery in Bag-route extras and truck-specific charges in Truck fees. There are no assumed labor rates. A total is a complete project budget only when you have entered every applicable cost.

Can I price stamped concrete or an overlay?

For a new poured patio, add a written stamping or finish quote to Other costs when it is the same for both routes. This tool does not estimate decorative premiums, pavers, resurfacing or thin overlay products, whose yields and preparation differ from concrete mix.

What does the break-even result mean?

It is a sampled comparison of needed volume including waste, from 0.01 to 40 yd³ in 0.01 yd³ increments. The reported point starts the final sequence of samples where the truck is no dearer than bags through 40 yd³. It is not an exact continuous threshold or a guarantee beyond that range. Whole bags, ordering steps and short-load fees can cause earlier switches.

Why are some prices or totals missing?

A blank bag price skips the bag cost route; a blank ready-mix price skips the truck cost route. Quantities still calculate. Blank fees, waste and Other costs count as zero. An explicit price of $0 is accepted as zero, so leave unknown prices blank rather than entering zero.